Tangab firuz abad dam

Tangab-Firuz Abad  storage  Dam

 

a) Location of   Dam : 

       This Dam  with capacity of 140MCM is  located  at the  entrance  of  Tangab Gorge  in  North-West of Firuz Abad city, having 12 Kilometer distance from Firuz Abad. This dam is storing the water inflowing from Firuz Abad  River tributary at  this  location.  Coordinate  of  dam  is  28° 57'  latitude   and  52° 32'  longitude. 

       The main base flow of this river is inflowing from Hanifaqan  Springs  with discharge of   between  2.5 to 5m3/sec

       These springs having variable discharge and 23out flow points. in the time of  important precipitation, various amount of floods inflowing from: Shurab plane,   Mahkuyeh  Valley,  Zanjiran and  Jovakan  basin  to Firuz  Abad  River.

       This river crosses Helalu Gorge, which is located at 5 Km from Dam-Site. This long  river, after flowing in large Tangab Gorge with length of about 7Km, enters to Firuz Abad  plane and after crossing this plane changes direction toward South east. After  traversing  the South of  Firuz Abad plane, this river arrive to another gorge  having  the name of Hayqer Gorge which has approx. length of 12 Km in that Gorge. Finally Firuz Abad river passes several salt domes to become completely saline water, then inflowing to Persian  Gulf  through  Monde  River.

 

b)   Location of   Firuz  Abad   plane  and   Irrigation Network:  

       Tangab storage Dam could regulate an average annual discharge of about 
103  MCM.  Per year.  

       Firuz Abad plane with  area of  27,500 ha  is located  between  28°- 45' to 29°-33' Northing and  52°-12' to 52°45'  Easting. Average altitude of  plane is 1250 m above  mean  sea level. Irrigation Network having  total gross area of 13,860 ha or net area of                 arable   land  is  about 13,350 ha.

 

       Background  and  aims  of   Project: 

1)  Background   study of  project   is  as   following :  

       Contract  award  of  phase I  study was effected on 16 March 1991 by Fars  Regional
      Water  Authority  to  Ab-Niru Consultant  Engineering  Company.

       Before  that time the pre-Reconnaissance study was made  in the Frame of General
(Master) plan of Monde-sheshpir project implemented by Justin and Country Consultant,  with  limited data of river  discharge in dry period, which could  not reach to  the  present  aims.

       After approval  of phase I  study in 1994 by Technical Bureau of Ministry of Energy, phase   II  study   was  awarded  to Ab-Niru  Consultant. 

       In 1995 a  general  review of water planning for  irrigation  Network  due  to  Ground  water currently used has been effected. Finally in 1997 all Design Reports of this  important  Dam  were  submitted  to the  client. 

       As  far as,  the construction of  this dam required  a displacement  of 

Shiraz-Kavar-Firuz Abad Highway
, this work shall be done before dam construction.. Because this Road was constructed near river at Dam Foundation. So, the construction of this highway displacement has been commenced since 1997 till 2002, having 11 Km length, 3 Tunnels in total length of 550m, 18 bridges & more than 2.8 Million cubic meters Earthwork. Finally Tender documents of Dam construction ( after approval of phase II study in 2001), have  been completed  for contract award.  The Dam construction award was made to Ave-Yol  Construction  Company in January of 2002.

 

2)  Qualitative  and Quantitative  project Goals:  

a) Collecting  and regulating variable river inflow  to  regulate annually  103 MCM / year.

  

3) improving the irrigation of arable lands :

    In left  Bank of  river about 3600 ha and  in  right bank about 4400ha. yielding to about 8,000 ha irrigated from wells with water demand  of  89. MCM / year.

 

4) developing  irrigation Network for left bank, about 8,360 ha and to, some how,
     regulate irrigation in  right bank with   springs  and  wells and Qanats  about  5,500 ha. 

     Other  goals of  Tangab  Dam   could   be as  following:

a) to control and regulate variable inflow for irrigation especially in dry months when
       water demand  is  high. 

b)  to control  annual floods  and  to prevent  its  damage   .

c) to  increase  annual  income of farmers  with  recommended  irrigation pattern and  use
    of  recent  technology. 

d) to increase the number of  Jobs for farming and  auxiliary industries about 2.5 times
    of   actual  available   Jobs.

e) to increase the area of  second cultivation per  year  " with intensity  of  137.7  percent"
     yielding higher amount of agricultural and orchards products, having in mind the
     prevention of   farmers  immigration to the  cities.

f) to improve environment of lake periphery with 1120 ha area, changing in local
      climatology by lake evaporation, also developing suitable fisheries for area and to
       create  recreation areas.

 

5) companies   and  organization having   some   activity  in  that  project :

       - Ab-Niru  Consultant  Engineering  Co.( for  Design   &  supervision ) 

       -  Soil   and  Material  Laboratory for  quality  control  tests.

       -  Allhadi  institution  for  crest  galleries  excavation  for  in investigation  .

       -  Infra-structures   Engineering   Construction Co.  for  diversion  Tunnel .

       -  Ave-Yol   construction  Co. for   Dam  Construction & ancillary  structures.

       - Aban- Sanat  Kara  for  Hydro- Mechanical  Works .

       - Development  and  Road  construction Co.  for   Road  construction. .

       -  Payab  Kossar   Construction Co.  for  3  Tunnels, of   road  Construction.. 

       - Shiraz  university for  dye   testing and   Karst  hydro- geological  investigation. 

       - some  other  organization and  companies, for  various  auxiliary  works.

 

6)  Technical  specification of  Project :

       a)  Generals

       - Catchments  area  to  dam-site                                                     : 1365  Km2

       -  average  height  of   basin                                                             :  1872  m

       -  highest  point of   mountains                                                         :  3100  m

       - river   bed   elevation at   dam site                                                :  1401  m

       - Average  annual   rainfull  over  Basin                                           :  533 mm

       - Average  annual  evaporation   from  lake   surface                        : 1940 mm

       - probable   Max.  Precipitation  ( PMP)                                        : 896 mm

       - peak Flood   discharge    with  1000 yr  return  period                   :  2740 m 3/ sec                       - peak  Flood  discharge with   10,0000 yr  return  period         : 3650 m 3/ sec

       - P.M.F.  Peak  discharge                                                   : 6370 m 3/ sec

       - Sediment   Copulation  for   50 years                                           : 22,55 MCM

 

       5-2)  Dam  Data :

a)  Dam   body 

       -  dam  height  from river  bed                                =  52 m

       -  dam  height   from  foundation                  = 56 m

       - Normal  water   level                                           = 1447 m

       - Max. water  level                                                 = 1451.75 m

       - Crest   elevation                                       = 1452.5   m

       - Min   water  level  ( intake   level )                        = 1420 m

       - dead   storage                                                      =  6 MCM

       - Life  storage                                                        = 134 MCM

       - Reservoir  Capacity                                             = 140 MCM

       - Alluvium  max.   thickness                                    = 36 m

       - Crest  length                                                        =  270 m

       - Crest  width                                                         =  10 m

       - lake  area  at  NWL                                             = 1120 ha

       - lake   area  at  Max  W.L                                     = 1450 ha 

       - Lake  Vol.  at  Max W.L                                     = 200 MCM

       - U/S  Slope   above   large  berm             = 1.V :  2.4 H

       - D/S slope  above  large   berm                             = 1.V: 2.0 H

       - U/S  berm  elevation  &  width                 =  1420 m &  35 m

       - D/S  berm elevation  &  width                              = 1415 & 40 m

         - Dam  volume                                                       =  1,508,500 m3

       - Clay core  volume.                                               = 204,000  m3

       - Rock fill  vol.                                                       = 680,000 m3

       - GW- GC  vol. &  transition                                  = 505,000 m3  

       - Filters                                                                  = 99.700 m3           

       -  Exaction  of   dam  foundation                 = 157,000 m3

       - Rock   exaction of   abutments                             =130,000 m3

 

b ) Diversion  Tunnel   and    water  intake

       - Tunnel, Internal  dia.                                            = 9.5 m3

       - Length                                                                 = 330 m

       - All  excavation                                                     =  73,000 m3

       - Concrete  vol.  ( Reinforced )                               =  18,700 m3

       - reinforcement                                                       =  3,250 tons

       - Diversion  flood   capacity                                    = 870 m 3/ sec

       - Water  intake   level                                             = 1420 m

          Pipe   dia.                                                           f 1600 mm in  Diver.  Tunnel.

c)  spillway ( side  spillway )

       - excavation in  rock                                               = 526,000 m3

       - excavation in  soil                                                 = 124,000 m

       - Plain & reinforced  concrete  vol.                         = 84,000 m3

       - ogee  crest  length                                                = 150 m

       - ogee  crest   elevation                                          = 1447 m

       - Spillway  Capacity  at   Max. Level                      = 4200 m 3/ sec

            ( about  PMF  routed ) 

 

d )  grouting galleries            

       - Crest   galleries    length                           =  620 m with access  gallery.

       - Lower   gallery  &  dia.                                        = 740 m (  3m dia )

       - access  galleries                                       = 565 m

 

e) bottom  outlet  at  N.W.L                                      = 60 m 3/ sec

       - intake  capacity  at   N.W.L                                 = 15 m 3/ sec

          with  pipe  of  f 1400 mm                                  

       -Length of  Water  pipe   through  Tunnel   bed       = 370 m 3 / sec

          with  f 1600 ml. with a  branch  to the river  with  discharge of  2-4  m 3/ sec

 

f)  water tightening   system  : 

       -  Cut  off  wall                                                       = 6,100  m 2

       -  drilling – grouting  of   curtain   grouting  = 60,000 mL

       - drilling – grouting  around  spillway   Van.             = 13500 mL 

          Consolidation   grouting                           = 18,000 mL  

کد خبر: 446
 2054
سایتـــ های مرتبطـ

آمار بازدیدکنندگان

  • کاربران آنلاین : 44
  • بیشترین بازدید همزمان : 399
  • بازدید امروز : 2,590
  • بازدید دیروز :
  • کل بازدید : 6,701,781
  • آخرین به روزرسانی : 3 دی 1403 13:36:03
  • شناسه IP شما : 3.133.133.251

راه‌های تماس با ما

  • آدرس : شیراز، بلوار ارم، شرکت سهامی آب منطقه‌ای فارس
  • کدپستی : 7143683685
  • تلفن : 07132252093
  • فاکس :
  • پست الکترونیکی : info[at]frrw.ir
  • پیامک :
  • تلفن گویا :