KHOSSUYEH  STORAGE  AND   REGULATING  DAM

                                                     

                                                      

       Khossuyeh  dam is  located   in  Fars  Province  and  Zarindasht  county. 

       The  site   of  this  dam   is  in  Kilometer ( Km ) 27 of   Darab- Hajiabad   highway.

       This   dam  is  multi function storage ,  diversion  and  regulating  structure   .

       The  Specifications  of  this   dam  are  as  follows :

       Dam  type                                      : Concrete

       Crest  Crown  Length                                  : 160 m

       Dam  Crest  width                           :  4.5 m

       Ogee  height  from top of  foundation           : 19   m

       Dam  Spillway  Crest  elevation                   : 1058.5 m  ( N.W.L. ) 

       Crest  elevation                                           : 1062 m  above  M.S.L

       Reservoir  volume  at   N.W.L                    : 15.7  MCM   

       Spillway  type                                             : OGEE

       Spillway  gates                                            :  10 with  dimension  of  6 m ´ 2.75  m 

       Grout  curtain in  bed rock               : Cement  bentonite and  chemical with  a total

                                                                            Length  of  4,600 m.

Project  Goals:

       -Flood control and regulation of sub-area Roodbal river and intermediate Darab plain  
          watershed.

       - Improvement and expansion of  agriculture lands in an area  equal  to 2450 hectares
          feeding  from the right   bank  of  river. 

       - Reclamation of 1000 hectares  of  land in this area after  canal  and basin construction
          for  artificial  recharge  feeding  from the  left  bank of  river.

       -Possibility of conveying and use of annually 9MCM of water from Roodbal dam to
         Khossuyeh  Reservoir .

         To increase  job  opportunities  and  reduce farmers   migration to the  cities. 

      

Total  Volume  of  construction Materials : 

       Total  volume  of   concrete   poured  in  dam   and related  structures  :   28000 CM

       Plane  concrete  of  foundation                                            : 20,000

       Weight   of  reinforcement                                                  : 315 tons

       Drilling  &  grouting                                                            : 4,600 m Long

       About 2.2 Km main road diversion around the Khossuyeh Lake ( Road of Darab
      to  Khossuyeh ).

                

                                                                                     

[content353]
[content354]
[content355]
[content356]
[content357]
[content358]
[content359]
[content360]
 296
سایتـــ های مرتبطـ

آمار بازدیدکنندگان

  • کاربران آنلاین : 19
  • بیشترین بازدید همزمان : 399
  • بازدید امروز : 1,076
  • بازدید دیروز :
  • کل بازدید : 6,723,167
  • آخرین به روزرسانی : 5 دی 1403 14:19:02
  • شناسه IP شما : 18.218.94.236

راه‌های تماس با ما

  • آدرس : شیراز، بلوار ارم، شرکت سهامی آب منطقه‌ای فارس
  • کدپستی : 7143683685
  • تلفن : 07132252093
  • فاکس :
  • پست الکترونیکی : info[at]frrw.ir
  • پیامک :
  • تلفن گویا :