Water supply and transmission to Haji Abad city

Water supply and transmission to Haji Abad city

                                                     

Objective:

  • Constructing pump station NO.2

  • Increasing water transmission capacity to Zarrin dasht up to 200 lit/sec

  • Constructing 7 additional cathodic protection stations between wells and Khasuyeh reservoir

 

Location: Fars province, Haji abad city of Darab

Clients: Fars, Boushehr & Khohkiloyeh Regional Water Organization

Study period: 1989-1991

Implementation period: 1995-1997

 

Project specifications:

  • Phase I: Implementation of about 60 Km transmission line of 300 to 400 mm diameter steel pipes, Construction of two collection and storage reservoirs with the capacity of 1500 and 2000 cum, Construction of one pump station in Khasuyeh, Construction of one pump station in Khsuyeh, Boring, equipping and electrical supply for 4 wells and Constructing 6 cathodic protection stations between Khasuyeh and Haji abad

  • Phase II: In order to increase the water transmission capacity to 200 lit/sec in this phase, pump station NO.2 and 7 cathodic protection stations between operation wells of Khasuyeh reservoir were constructed

 

Technical specifications of pump station:

  • Pump type: WKL 150/3 -Pumpiran
  • Electromotor: 270 hp (200 Kwatt) -Bruk Hance, 1450 rpm, 3 phase, 380 volt
  • Discharge capacity of each pump: 100 lit/sec
  • Number of Pumps: 3 pumps that one is considered for reservation
  • Total dynamic head: 120 m
  • Supply rate: 150 lit/sec (based on current conditions)
  • Pump station transmission rate: about 150 lit/sec
  • Increased water transmission capacity: about 60 lit/sec


 

Water transmission of Tang-e Dorahak wells to Deyr reservoir

 

Objective:

  • Implementing transmission line from Tang-e Dorahak to Deyr reservoir in order to increase inflow to Deyr reservoir

 

Location: Boushehr province, Kangan, Deyr

Clients: Fars, Boushehr & Khohkiloyeh Regional Water Organization

Study period: 1990-1999 (Design and Revision)

 

Project specifications:

  • Pipeline material: ST37-2 steel and Asbestos
  • Number of wells: 3
  • Well diameter: 12.5 in
  • Well depth: 100 m
  • Steel pipeline diameter: 200 mm
  • Asbestos pipeline diameter: 200 mm
  • Total steel pipeline length: 2355 m
  • Total asbestos pipeline length: 5855 m
  • Number of pumps: 3
کد خبر: 441
 1490
سایتـــ های مرتبطـ

آمار بازدیدکنندگان

  • کاربران آنلاین : 36
  • بیشترین بازدید همزمان : 399
  • بازدید امروز : 2,566
  • بازدید دیروز :
  • کل بازدید : 6,701,757
  • آخرین به روزرسانی : 3 دی 1403 13:36:03
  • شناسه IP شما : 3.145.79.214

راه‌های تماس با ما

  • آدرس : شیراز، بلوار ارم، شرکت سهامی آب منطقه‌ای فارس
  • کدپستی : 7143683685
  • تلفن : 07132252093
  • فاکس :
  • پست الکترونیکی : info[at]frrw.ir
  • پیامک :
  • تلفن گویا :