SHIRAZ WATER SUPPLY PROJECT
This project includes augmentation of water supply installation's capacity to
Introduction and goal of the project
The goal of “Augmentation of existing water supply installation’s project” is to increase the amount of water transmitted by two folds than before and with the ceiling of 156,000 cubic meters per a full day and night period.
It is also aimed to achieve the final goal of increasing potable water storage capacity required for the consumption of
Location and Sections of the Project
This project consists of renovation of three pumping stations, one potable water treatment plant, telemetry system, several reservoirs and one raw and treated water transmission line. The boundary to execute construction works of the project begins at Doroudzan dam and along transmission line beside Doroudzan dam road to the bridge named Khan, and then continues along the Isfahan-shiraz road and within the
The capacity of pumping stations number 1, 2 and 3, are 9,600, 6,500 and 6,500 cubic meters per hour respectively. The capacity of potable water treatment plant, situated within the boundary of pumping station number 2 is 6,500 cubic meters per hour and the transmission capacity of different segments of pipeline varies between 3,500 to 9,600 cubic meters per hour.