SHIRAZ WATER SUPPLY PROJECT

Transmission from Sheshpir Dam location

 

      This project includes transmission or raw water from Sheshpir dam location through construction of pipelines and balancing tank.

 

Introduction and goal of the project

 

      The goal of this section of Shiraz long term potable water supply project, is to provide part of the required water for target period of 1405 (2026) having capacity 1.25 cubic meters per second and yearly average of 35 million cubic meters for both potable and sanitary purposes.

 

Location and Sections of the Project

 

      Pipeline 42.6 kilometers long starts at Sheshpir dam location and along the Shiraz-Yasouj road passing through villages Shul, Sangar, Khalar and Golestan, conveys raw water to the balancing tank, and from then on 21 kilometer long transfers water to the treatment plant. The project sections are as indicated bellow.

 

  • Intake from Sheshpir dam reservoir
  • Gravitational conveyance, 42.6 kilometers from Sheshpir dam to balancing tank.
  • 10,000 cubic meters capacity balancing tank.
  • Gravitational conveyance, 21 kilometers from balancing tank to potable water treatment plant.

 

     The conveyance capacity from Sheshpir dam to potable water treatment plant is 1.25 cubic meters per second.

[content353]
[content354]
[content355]
[content356]
[content357]
[content358]
[content359]
[content360]
 1519
سایتـــ های مرتبطـ

آمار بازدیدکنندگان

  • کاربران آنلاین : 14
  • بیشترین بازدید همزمان : 399
  • بازدید امروز : 1,061
  • بازدید دیروز :
  • کل بازدید : 6,723,152
  • آخرین به روزرسانی : 5 دی 1403 14:19:02
  • شناسه IP شما : 52.15.233.83

راه‌های تماس با ما

  • آدرس : شیراز، بلوار ارم، شرکت سهامی آب منطقه‌ای فارس
  • کدپستی : 7143683685
  • تلفن : 07132252093
  • فاکس :
  • پست الکترونیکی : info[at]frrw.ir
  • پیامک :
  • تلفن گویا :